Gurus,
We are moving offices, and the construction company is bugging us about
power and AC requirements for a new server room (we have 3 half full
racks)
We have looked at the servers, and e.g. an E450 has a maximum power usage
of 13.6Amps (I would guess at 100V), and maximum heat output 5680 BTU/hr.
However, how do I get these #'s down to a realistic #?
Is there are some rule of thumb? If I calculate all maximum powers of all
equipment I get something like 110Amps and 47000BTU/hr, which is highly
unrealistic.
If you can point to some docs on standards, that could help too.
Thanks.