[Q] how to make interactive job uninterrupt running?

From: L (leed@CHELE.CAIS.NET)
Date: Tue Jul 01 2003 - 22:01:49 EDT


we have database client/server architecture. Users normally running jobs
interactive from PC and connect to AIX server. Sometime their have
problem happen like power surge or PC hang the long runnig interactive
jobs on serve will also stop. Does their has way to make long running
interactive job continue run on server side even client side power off?

Thanks.



This archive was generated by hypermail 2.1.7 : Wed Apr 09 2008 - 22:16:59 EDT