We are looking at upgrading a V5.1 cluster to V5.1B with the latest patch
kit. A test upgrade has been performed using a rolling upgrade, however this
is a very long process with lots of reboots required etc. in order to
facilitate rolling.

Is it possible to do this upgrade without doing a rolling upgrade? Ie. We
are happy for the cluster to be out for a weekend, but we want the upgrade
to be as quick as possible. The rolling upgrade process takes too long. Can
we avoid it?